AAD167 2 Only 10 kw Invicta Vibrator motors, 960 rpm
R100 000 eachAAD167 2 Only 10 kw Invicta Vibrator motors, 960 rpm. Reconditioned, sold as a pair only. North West Province, R100 000 each (30-05-2025) [02-04-2026]
Showing 1–16 of 33 results
AAD167 2 Only 10 kw Invicta Vibrator motors, 960 rpm. Reconditioned, sold as a pair only. North West Province, R100 000 each (30-05-2025) [02-04-2026]
CBA048 Wanted – Vibrating Screen, 5 ft x 16 ft, single deck, equipped for poly panels. (08-04-2026)
CBA048 Wanted – Vibrating Screen, 6 ft x 16 ft, single deck, equipped for poly panels. Preferably without vibrator motors (24-06-2026)
MAA033 12 ft Diggers Pan with feed conveyor, in good working condition when operation was seized. Electrical control box was renewed shortly before operation was seized. Price includes sand blasting and respraying. Northern Cape area, R280 000 (28-07-2026)
MAB0103 CD 12 Centrifugal Concentrator, refurbished. 20 Tons per hour production. Complete with VSD. Free State area, R485 000 (15-01-2026) [07-05-2026]
MAB013 Chrome Washing Plant 15 000 to 20 000 t p/m, turn-key installation, with the facility to increase production at an additional cost. All new components with 48 x double start, 14 turn Mineral Technologies gravity spirals. Spirals and vibrating screen have been utilized in a test run only. Engineering drawings and all modules are available. 2 Month delivery lead time from receipt of deposit. The price includes construction, assembly and commissioning by mineral process engineer as well as crane rental and transport to site. The price excludes, all crushing, milling, civil’s and the dams, we could assist with these at additional cost, we could also assist with the Environmental Permit and water permit, these can be obtained in 30 days, costing needs to be verified with the DMR Consultant. Gauteng, R14m. (17-04-2012) [04-03-2024]
MAB082 Newly manufactured Rake Thickener, 46 m diameter x 13 m high, steel – bolt together for transport. lead-time to manufacture – 6 months from receipt of deposit. Gauteng, R80m. Price excludes transport, civil`s, erection and commissioning cost`s. These can also be supplied at an additional cost, POR. Conventional thickeners from 4 m dia to 46 m dia can be manufactured on order, POR. Thickeners from 4 m dia to 46 m dia can be manufactured on order, POR (12-03-2025)
MAB090 Gold Processing Plant, 70 tph, CIP / CIL. Complete with crushing and processing, 300 mm feed size. lead-time to manufacture – 18 to 24 months from receipt of deposit. Gauteng, R240m. Price excludes transport, civil`s, erection and commissioning cost`s. These can also be supplied at an additional cost, POR. (12-03-2025)
MAB091 Gold Washing Plant, 200 tph, 600 mm feed size, screened down to 200 mm. Complete with scrubber, Knelson concentrators and sluice boxes. lead-time to manufacture – 4 months from receipt of deposit. Gauteng, R25m. Price excludes transport, civil`s, erection and commissioning cost`s. These can also be supplied at an additional cost. Crushing can also be supplied if required, POR. (12-03-2025)
MAB0912 Gold Processing Plant, 70 tph, CIP, without crushing. Price includes: Ball Mill, 30 tph. Thickener. CIP Plant. Carbon Column. Plating Plant. lead-time to manufacture – 8 to 12 months from receipt of deposit. R110m, Gauteng (16-04-2025)
MAB101 Flotation cell, 4.7 m high x 3.3 m wide, new condition. Pretoria area, R850 000 (01-10-2025) [09-04-2026]
MAB102 Flotation cell, 3.5 m high x 2.6 m wide, new condition. Pretoria area, R650 000 (01-10-2025) [09-04-2026]
MAB103 Newly manufactured Flotation Plants, 1 to 3 tph capacity. Ideally suited for Gold, PGMs, Copper, Cobalt and Lithium. No installation required, operational within 30 minutes of arrival on site. Mounted on a 5 ton, double axle trailer. No electricity/generator required. Price includes jaw crusher, conveyor belt, diesel power mill, sluice, conditioning tank and flotation cell. Complete unit fits in a 6 meter shipping container. Gauteng, R1,836m each (11-06-2020) [17-06-2026]
MAB104 3 Only Replica James Tables. Free State area, R35 000 each (09-02-2026) [07-05-2026]
MAB105 Newly manufactured 80 tph Spiral Plant complete. 16 Weeks delivery delay from receipt of deposit. Mpumalanga, R9m each. Transport, erection and commissioning can also be provided at an additional cost, POR (12-02-2026)
MAB106 Newly manufactured 30tph to 200tph Alluvial Gold Plants complete. 10 To 16 weeks delivery delay from receipt of deposit. Mpumalanga, R1.5m to R30m each. Transport, erection and commissioning can also be provided at an additional cost, POR (12-02-2026)