Showing all 10 results

  • MAB0103 CD 12 Centrifugal Concentrator

    MAB0103 CD 12 Centrifugal Concentrator

    R485 000

    MAB0103 CD 12 Centrifugal Concentrator, refurbished. 20 Tons per hour production. Complete with VSD. Free State area, R485 000 (15-01-2026) [07-05-2026]

  • MAB090 Gold Processing Plant, 70 tph, CIP / CIL

    MAB090 Gold Processing Plant, 70 tph, CIP / CIL

    POR

    MAB090 Gold Processing Plant, 70 tph, CIP / CIL. Complete with crushing and processing, 300 mm feed size. lead-time to manufacture – 18 to 24 months from receipt of deposit. Gauteng, R240m. Price excludes transport, civil`s, erection and commissioning cost`s. These can also be supplied at an additional cost, POR. (12-03-2025)

  • MAB091 Gold Washing Plant, 200 tph, 600 mm feed size

    MAB091 Gold Washing Plant, 200 tph, 600 mm feed size

    POR

    MAB091 Gold Washing Plant, 200 tph, 600 mm feed size, screened down to 200 mm. Complete with scrubber, Knelson concentrators and sluice boxes. lead-time to manufacture – 4 months from receipt of deposit. Gauteng, R25m. Price excludes transport, civil`s, erection and commissioning cost`s. These can also be supplied at an additional cost. Crushing can also be supplied if required, POR. (12-03-2025)

  • MAB0912 Gold Processing Plant, 70 tph, CIP

    MAB0912 Gold Processing Plant, 70 tph, CIP

    R110m

    MAB0912 Gold Processing Plant, 70 tph, CIP, without crushing. Price includes: Ball Mill, 30 tph. Thickener. CIP Plant. Carbon Column. Plating Plant. lead-time to manufacture – 8 to 12 months from receipt of deposit. R110m, Gauteng (16-04-2025)

  • MAB104 3 Only Replica James Tables

    MAB104 3 Only Replica James Tables

    R35 000 each

    MAB104 3 Only Replica James Tables. Free State area, R35 000 each (09-02-2026) [07-05-2026]

  • MAB106 Newly manufactured 30tph to 200tph Alluvial Gold Plants complete

    MAB106 Newly manufactured 30tph to 200tph Alluvial Gold Plants complete

    POR

    MAB106 Newly manufactured 30tph to 200tph Alluvial Gold Plants complete. 10 To 16 weeks delivery delay from receipt of deposit. Mpumalanga, R1.5m to R30m each. Transport, erection and commissioning can also be provided at an additional cost, POR (12-02-2026)

  • MAB107 Newly manufactured 40tpd CIL Gold Plants complete

    MAB107 Newly manufactured 40tpd CIL Gold Plants complete

    POR

    MAB107 Newly manufactured 40tpd CIL Gold Plants complete. 10 To 16 weeks delivery delay from receipt of deposit. Mpumalanga, R6m each. Transport, erection and commissioning can also be provided at an additional cost, POR (12-02-2026)

  • MAB109 Newly manufactured Gold Washing Plants, 10 to 15 tph capacity

    MAB109 Newly manufactured Gold Washing Plants, 10 to 15 tph capacity

    R183 000 each

    MAB109 Newly manufactured Gold Washing Plants, 10 to 15 tph capacity. Ultimate combination of proven traditional gold equipment and modern 3D sluices with exceptional recovery efficiency. Designed for tough Africa conditions with simplicity of operation in mind while maintaining high efficiency. Our 3D sluice mats are far superior to conventional grid covered miners moss that blocks up in minutes allowing fine gold to escape. Clients see 10 micron particles in our mats. Maintenance is an absolute minimum and limited to normal pipework repair, pump servicing etc. All our Washing Plants come as complete mining kit including basic tools & spares. Gauteng, R183 000 each (11-06-2026)

  • MAB110 Newly manufactured Gold Washing Plants, 60 to 100 tph capacity.

    MAB110 Newly manufactured Gold Washing Plants, 60 to 100 tph capacity.

    R960 000 each

    MAB110  Newly manufactured Gold Washing Plants, 60 to 100 tph capacity. Ultimate combination of proven traditional gold equipment and modern 3D sluices with exceptional recovery efficiency. Designed for tough Africa conditions with simplicity of operation in mind while maintaining high efficiency. Our 3D sluice mats are far superior to conventional grid covered miners moss that blocks up in minutes allowing fine gold to escape. Clients see 10 micron particles in our mats. Maintenance is an absolute minimum and limited to normal pipework repair, pump servicing etc. All our Washing Plants come as complete mining kit including basic tools & spares. Gauteng, R960 000 each (11-06-2026)

  • MAB111 Newly manufactured Gold Washing Plants, one ton/hour capacity

    MAB111 Newly manufactured Gold Washing Plants, one ton/hour capacity

    R54 000 each

    MAB111 Newly manufactured Gold Washing Plants, one ton/hour capacity. Ultimate combination of proven traditional gold equipment and modern 3D sluices with exceptional recovery efficiency. Designed for tough Africa conditions with simplicity of operation in mind while maintaining high efficiency. Our 3D sluice mats are far superior to conventional grid covered miners moss that blocks up in minutes allowing fine gold to escape. Clients see 10 micron particles in our mats. Maintenance is an absolute minimum and limited to normal pipework repair, pump servicing etc. All our Washing Plants come as complete mining kit including basic tools & spares. Gauteng, R54 000 each (11-06-2020)