MAB013 Chrome Washing Plant 15 000 to 20 000 t p/m
R14,000,000.00MAB013 Chrome Washing Plant 15 000 to 20 000 t p/m, turn-key installation, with the facility to increase production at an additional cost. All new components with 48 x double start, 14 turn Mineral Technologies gravity spirals. Spirals and vibrating screen have been utilized in a test run only. Engineering drawings and all modules are available. 2 Month delivery lead time from receipt of deposit. The price includes construction, assembly and commissioning by mineral process engineer as well as crane rental and transport to site. The price excludes, all crushing, milling, civil’s and the dams, we could assist with these at additional cost, we could also assist with the Environmental Permit and water permit, these can be obtained in 30 days, costing needs to be verified with the DMR Consultant. Gauteng, R14m. (17-04-2012) [04-03-2024]